Pedestrian Bridge Erection Engineering, Calgary Alberta

Allnorth provided construction engineering services for the new Weadick Crossing pedestrian bridge in Calgary, Alberta. The scope of work included design of the cast-in-place deck formwork system for the 46 metre long steel arch pedestrian bridge providing access to the Calgary Stampede Fairgrounds.

Allnorth’s responsibilities included the detailed design of the deck formwork system, the modification details to bridge hanger connections supporting the formwork, and the cable tie-back details providing lateral stability to the formwork system.

RESPONSIBILITIES:

  • Structural engineering
  • Construction engineering

Services in this project

Civil Engineering

Allnorth has the personnel and resources to effectively manage entire projects from concept to construction.

See Service

Project and Construction Management

At Allnorth, we believe that communication and teamwork, from start to finish, are key to the successful execution of any project. We work closely with our clients to plan and manage projects from initial concept through to delivery.

See Service

Structural Engineering

Allnorth provides comprehensive structural engineering design services for industrial, commercial, and municipal clients. We design short- and long-span bridge structures; municipal, industrial, and commercial buildings; and temporary construction works.

See Service