Mount Polley – Magnetite Separation Project

Allnorth was commissioned by Imperials Metals Corporation to provide structural and mechanical design services for their magnetite separation project. The Project consisted of a super structure designed to support and provide access to the magsep process equipment, including magseps, a disc filter and filtrate conveyor. The magsep system was positioned above existing equipment in the floatation cell building, while the disc filter and filtrate conveyor were located in a new building extension, which was also designed by Allnorth. The team provided detailed drawings and material quantities for the conveyor system. Allnorth also provided support for construction of the conveyor through liaison, inspection and communication with the fabricator/installer.