Dover West Access Road Bridge Design and Construction Review - Fort McMurray, AB

Allnorth was engaged by Ruskin Construction Ltd. in a design/build relationship to complete the detail design, and perform quality control inspection including survey layout for five bridge structures located on the Dover West access road. 

With draft concepts provided by the Owner, Allnorth optimized the designs and provided fast track detail design services. The project was awarded mid November 2011, construction commenced early January 2012 and construction was complete late summer 2012. All design and construction was completed in accordance with Alberta Transportation standards.

Allnorth responsibilities:

  • Bridge concept review
  • Site survey
  • Detail bridge design
  • Quality control monitoring and survey layout during construction

Services in this project

Structural Engineering

Allnorth provides comprehensive structural engineering design services for industrial, commercial, and municipal clients. We design short- and long-span bridge structures; municipal, industrial, and commercial buildings; and temporary construction works.

See Service

Surveying

Our experienced team of professional and technical survey staff use Real Time Kinematic (RTK) GPS, robotic total stations, CADD On Site, and 3D laser scanning to support projects in a variety of industries.

See Service