Construction Engineering - Cameron Street Bridge, Prince George, BC

Replacement of the Cameron Street bridge in Prince George, BC, involved demolition of the existing timber Howe truss bridge superstructure, reconstruction of the existing pier caps, construction of new abutments and installation of a new 4 span, 187 m long, steel girder, two lane bridge.

IDL Projects Inc. (IDL) engaged Allnorth to provide construction engineering services for the project. These services included conceptual and detailed designs, liaison with the bridge designers, plus construction inspections and supervision. An innovative approach was developed for the demolition and launch procedure by utilizing the existing timber bridge to launch the new superstructure. During the launch, each span of the existing truss was “picked-up” and dismantled piece by piece to meet the contract salvage requirements.

Allnorth Responsibilities:

  • Field inspections
  • Conceptual designs
  • Detailed design
  • Cost estimates
  • Liaison with bridge designers
  • Construction inspections
  • Construction supervision

Services in this project

Project and Construction Management

At Allnorth, we believe that communication and teamwork, from start to finish, are key to the successful execution of any project. We work closely with our clients to plan and manage projects from initial concept through to delivery.

See Service

Structural Engineering

Allnorth provides comprehensive structural engineering design services for industrial, commercial, and municipal clients. We design short- and long-span bridge structures; municipal, industrial, and commercial buildings; and temporary construction works.

See Service